Review 02
Please Log In for full access to the web site.
Note that this link will take you to an external site (https://shimmer.mit.edu) to authenticate, and then you will be redirected back to this page.
Second Review
Our next review is during Lab on March 20.
The high-level goal for this review is to demonstrate that all the subsystems in your system meet spec.
Format
More specifically, the team will want to present:
- Well-developed block diagrams of the HW, FW, and SW.
- Circuit schematic (and PCB) for the HW
- A wireframe or statically coded web front-end
- Industrial design for the HW node -- what does it look like? How is it protected from the environment? How does it connect to the bus stop pole, or tripod, etc.?
- A complete specifications sheet
- For each specification, description of how you achieved that specification (such as a test, or component selection) along with data from tests
- If any specification is not met, explicitly state it
- A detailed milestone and deliverables sheet encompassing the period between now and April 26
- Details on how the system satisfies both clients' requirements
- BOM
- power budget using measured values
- Questions that need answering, either from the team, the staff, or the partner.
- Current team roles
Presentation guidelines
-
You can present from a staff computer or your own.
-
It's not necessary for each team member to present, but it is also fine to do so.
-
Make the slides informative...and professional.