Review 02

You are not logged in.

Please Log In for full access to the web site.
Note that this link will take you to an external site (https://shimmer.mit.edu) to authenticate, and then you will be redirected back to this page.

Second Review

Our next review is during Lab on March 20.

The high-level goal for this review is to demonstrate that all the subsystems in your system meet spec.

Format

More specifically, the team will want to present:

  • Well-developed block diagrams of the HW, FW, and SW.
  • Circuit schematic (and PCB) for the HW
  • A wireframe or statically coded web front-end
  • Industrial design for the HW node -- what does it look like? How is it protected from the environment? How does it connect to the bus stop pole, or tripod, etc.?
  • A complete specifications sheet
  • For each specification, description of how you achieved that specification (such as a test, or component selection) along with data from tests
    • If any specification is not met, explicitly state it
  • A detailed milestone and deliverables sheet encompassing the period between now and April 26
  • Details on how the system satisfies both clients' requirements
  • BOM
  • power budget using measured values
  • Questions that need answering, either from the team, the staff, or the partner.
  • Current team roles

Presentation guidelines

  • You can present from a staff computer or your own.

  • It's not necessary for each team member to present, but it is also fine to do so.

  • Make the slides informative...and professional.